Introduction
In the building insulation process, the infrastructure has a key and decisive place in the installation of isogam. Although buying the best isogam brand is critical for the residents of Karaj, the lack of attention to the fundamental infrastructure can eliminate all the costs and efforts that have been spent on insulation. However, many people, and even some installations, ignore or do not care about the infrastructure stage.
Why is the infrastructure important in installing isogam?
Incorporation in the installation of the isogam forms the basis of the strength and durability of the insulation. Without principled infrastructure, even the best isogam cannot perform well to prevent water and moisture from penetrating. In fact, if the underlying surface of the isogam is contaminated, rough, humid or damaged, the adhesion of the isogam layers will be eliminated and after a short time you will see leakage, winding and cracking on the surface.
Karaj's climatic characteristics and its impact on infrastructure on isogam installation
Karaj City require special conditions for insulation due to the diversity of climate, seasonal rainfall, winter cold and warm and sunny summers. Some of the prominent features of Karaj climate are: The difference between day and night temperature Cold winters and frozen Scattered rains in spring and autumn The sunlight and direct radiation in the summer All of this shows that the infrastructure in the installation of the isogam in the area should be done in accordance with the professional principles, with durable materials under the supervision of expert experts.
The infrastructure steps in the installation of isogam; Step by step
1. Full surface cleansing
The first step of the infrastructure in the installation of the isogam is to clean up the work level. Any dust, flower, extra cement, color, oil or fat should be completely eliminated. Level cleanliness makes the isogam layer completely connected to the surface.
1. Repair of injuries The surfaces on which the isogam are to be mounted may be cracked, shell or damaged. Restoration of these problems using cement and cementing mortar or specialized restorative materials is the essential part of the isogam installation that multiply the life of the isogam.
1. Creating standard slope
Creating a suitable slope to direct water to the outlets or gutters is one of the golden principles of infrastructure in the installation of isogam. Non -sloping will cause water to collect, create snow and ice and damage insulation.
1. Complete drying of the surface Another of the most important steps in the installation of isogam is the complete dryness of the bed. The remaining water or moisture can prevent the adhesion of the isogam and provide insulation. Usually, at least 2 hours after washing or rainfall, you should wait for the surface to dry.
1. Primer or bake the surface
To increase the adhesion of the isogam to the surface, the use of a special primer layer or diluted bitumen is recommended. This while boosting adhesion, porosity and permeability reduces concrete or cement permeability and provides a firm installation.
1. Ensure uniformity and infrastructure health At the end of the infrastructure process in the installation of the isogam, the surface of the roof or any other environment should be completely uniform, free of cavity and cracks and without loose spots. This final control must be done by experienced people.
Impact of infrastructure on isogam installation on insulation life
One of the determining factors in the durability of the isogam is to pay attention to professional and principled infrastructure. In projects that have been specialized in the installation of isogam, the life of the isogam is an average of 5 years or more and the need for frequent repairs has declined sharply. This is important for homeowners and builders of buildings in Karaj in terms of cost and economy.
The role of standard materials and tools in isogam infrastructure
To properly implement the infrastructure in the installation of isogam, the use of high quality tools and materials is essential: Using high quality primers Type 2 cement and standard materials Suitable materials for sloping (mineral shell, cement sand) Industrial cleaning tools such as blowers and industrial vacuum cleaners
Infrastructure Review in the Installation of Isogam Different Areas of Karaj; Golden Tips
roof of buildings In Karaj, the roofs need a stronger infrastructure because of the size and direct contact of the sun and rain. Using a strong primer, controlling slope and examining the weaknesses of the roof should be obsessive. Pools and water resources Here the infrastructure in the installation of the isogam should be done with a few layers of coating, strong adhesion and complete control of the seams so that the smallest leakage does not small.
toilets and kitchen In these sections, the installation of isogam means sealing all angles, corners, shoe and pipe fittings. Usually, using waterproof mortar and the abundance of bitumen, these areas become completely resistant.
Essentials for residents of Karaj before implementing infrastructure in isogam installation
Set the installation program in coordination with air forecast (avoid rainy days) Use free advice Emotional Store in Karaj and view infrastructure portfolio. Before starting, make sure the valves, shoe and water collection systems. Close the implementation of the infrastructure in the installation of the isogam only with experienced and experienced people.