Zero -to -hundred building wiring
Building wiring steps


Important steps of building wiring

Fartak Electric Tehran performs all industrial, construction, commercial, office, shop electrical works Fix the connection as soon as possible 💥 Installation of industrial and construction electrical panels 💥Optimization and load distribution of three-phase switchboards 💥 Installation of transformer and stabilizer to stabilize the voltage 💥Troubleshooting of telephone lines and noise removal 💥 Installation of telecommunication cruise terminal for telephone board Installing the central antenna
study time 1 minute