همین حالا تماس بگیرید!
پاسخ فوری و مشاوره رایگان در انتظار شماست.
If you only know the dimensions of the furnace before ordering, you still don't have enough information to design the color line. Type of paint, material and heaviest part, number of parts required per shift and workshop space determine what furnace is needed and how the spraying and handling equipment should work alongside it. This guide will help you translate your needs into specifications against which to compare construction proposals.
Why choosing a furnace should start from the part and the process?
The furnace is part of a process, not an independent device. In the powder paint line, the piece enters the baking stage after surface preparation and spraying. In a liquid paint line, the type of coating and its drying method can create different requirements for ventilation and equipment. Therefore, before choosing the burner, element or dimensions of the cabin, it should be clear which coating is applied to which part.
A common mistake is to equate "the time the piece is in the oven" with the "paint curing time". In powder paint, the piece must first reach the required temperature; Then the duration of storage at that temperature is calculated according to the instructions of the powder manufacturer. A heavy part and a thin part, even in the same furnace, do not necessarily have the same thermal behavior. Take the baking program from the technical sheet of the same color, not from a fixed number for all orders.
What specifications should we determine before making the color furnace?
Parts and actual production capacity
Record the dimensions of the largest piece, along with the space needed to hang, turn, or pass through. Next, specify the weight of the heaviest piece and the number of desired pieces in each shift. This information affects the inner space of the furnace, the strength of the transport system, the distance between the parts and the choice of batch or continuous furnace.
If your production is varied and rotating, checking the batch furnace is more logical; If similar parts are produced in continuous flow, you should also evaluate the possibility of a continuous line. None are "better" simply because of their name or size.
Covering, cooking and air circulation
Get a technical sheet from the paint supplier that includes the firing conditions and provide it to the kiln manufacturer. Also ask about the place of temperature measurement: Showing the air temperature of the oven alone does not prove that all parts of the part have passed the necessary baking cycle. For technical delivery, agree in advance the method of measuring the temperature of the part and checking the uniformity of the conditions in different loading positions.
Spray booth and process safety
When ordering paint line equipment manufacturing, do not price the spray cabin, suction and filtration separately from the furnace and check their functional relationship. In powder spraying, dust control, ventilation and ground connection of equipment and parts are important. For solvent-based paints, flammable vapors during drying should also be considered in the safety assessment. The details of the design must be compatible with the substance, its safety data sheet and the evaluation of the safety expert.
Work safety guidelines and standards in this field are useful for recognizing technical risks; Citation to them does not mean confirming the compliance of a workshop in Tehran with local requirements. Before installation, check the air discharge path, energy supply and safety requirements of the place of operation with the relevant expert and authority.
Checklist for comparison of construction proposals
To compare offers, ask each manufacturer for written answers to these questions:
Subject | Questions that can be asked before ordering |
Scope of work | Furnace, cabin, filtration, part transfer And which parts exactly does the setup include? |
Design Basis | The design is based on which parts, load weight, color type and capacity of each shift? |
Cooking | What is the method of temperature control and testing of the cooking cycle on the part? |
Safety | Ventilation, grounding, fault control and safe disconnection of equipment How to predict have been done? |
Delivery | What tests will be performed with real load and what documents will be delivered? |
Maintenance | What is the access to filters, fans, burner or element and consumable parts? |
Compare the price after equalizing the bid range. A proposal that includes only the furnace body with a proposal that also covers installation, commissioning, and performance testing has no basis for direct comparison.
summary
To order the manufacture of a paint oven, start from the part and coating specifications; Then write capacity, line layout, safety and delivery criteria. Save this checklist so you don't miss an important question when comparing offers. If you have the option to save the article in your Behzi account, keep it there. To raise the project specifications with Jahan Pashash, use the active communication method on the business site.



