Fadakar Canalization in Tehran manufactures and installs all kinds of ducts and air valves, fan coil ducts, split ducts and waste shooting with high quality, accurate execution and reasonable prices.

study time 1 minute

image

What is litter shooting and why is it necessary?

The main components of the garbage shooting system

1. Main Duct

2. Intake Doors

3. Cleaning System

4. Speed ​​Bump

5. Ventilation

Why is dedicated channelization the first choice of creators?

A variety of applicable shooting systems

Dedicated channelization team offers various systems depending on the type of building use:

1. Construction waste shooting

In projects under construction or renovation, it is difficult to carry sewage down. We design temporary or permanent shooting systems with thick and impact-resistant sheets to transfer waste. The construction and installation of waste shooting with dedicated channelization in garbage collection models ensures the safety of workers and pedestrians.

2. Linen Chute Shooting

This system is for hotels and hospitals. Instead of garbage, sheets and dirty clothes are moved from the floors to the laundry room. In the construction and installation of waste shooting with devoted channeling for bed sheet models, great care is taken to polish the inner surface so that the fabrics are not damaged or torn.

3. Shooting with Segregated Chute

In green and environmentally friendly buildings, two-channel systems or systems with smart valves (Bi-sorter) are implemented, which enables the separation of dry and wet waste from the source. Dedicated channelization is the leader in the implementation of these modern systems in Tehran.

Project implementation steps by Fadakar group

When you order a construction and installation project of waste shooting with dedicated channelization, the work proceeds according to a detailed plan:

First stage: visit and feasibility assessment: our experts visit the project site and check the installation documents. The best route to cross the channel that occupies the least useful space is determined.

The second step: drawing the map: based on the number of floors and the type of waste, the diameter of the channel (usually 50 or 60 cm) is calculated.

Third stage: production in the factory: channel parts, elbows and valves are made with laser cutting and precision rolling machines in dedicated channel making workshop.

Fourth stage: installation and assembly: the installation team with full safety equipment installs the parts in the duct and performs the support operation. The supports must bear the heavy weight of the steel channel.

5th stage: testing and commissioning: the washing and ventilation system is tested and after making sure that there is no leakage, the work is handed over to the employer.

The importance of the compactor in the shooting system

At the end of the shooting channel, the garbage must be collected. In large complexes, the volume of waste is very large. Fedakar Canalization suggests to use Zubale Compactor in addition to the construction and installation of waste shooting with Fadakar Canalization. This device compresses waste and reduces its volume by one fifth. This will reduce the number of times the tank is emptied and its leachate will be taken.

Safety and fire prevention tips

One of the important requirements in towers is to prevent the spread of fire. The shooting channel can act like a chimney and pull the fire from the waste tank to the upper floors. In the process of construction and installation of garbage shooting with dedicated channelization, it is necessary to install fire dampers and fire extinguishing sprinklers inside the channel and garbage chamber. We include all the standards of the fire department in our design and implementation so that the building can be completed without any problems.

The price of construction and installation of waste shooting

The cost of implementing this system depends on various parameters:

  • The height of the building and the number of stops.
  • The material of the sheet (stainless steel 304 is more expensive than galvanized but it has an eternal life).
  • Ancillary equipment (automatic washing system, electric brush, ventilation).
  • Diameter of the channel.

Despite the fluctuations of the currency price and the fact that steel sheets are imported, Fadakar Channelization tries to offer the most competitive price for the construction and installation of garbage shooting with Fadakar Channelization. By eliminating middlemen and producing parts directly, we have reduced the final cost for manufacturers. To receive an accurate pre-invoice, just send us your architectural drawings.

Maintenance and repairs

Shooting systems do not need special repairs if they are made properly. However, periodic servicing of the flushing system and inspection of the valves is recommended. Steel channels implemented in waste shooting construction and installation projects with devoted channeling work for years without corrosion and perforation due to their high quality. We attach after-sales service and a valid warranty to our contract so that you can have peace of mind.

The effect of shooting on property value

At first glance, the cost of building and installing a dedicated channelized waste shoot may seem high, but this system is a great added value to your property. Buyers of luxury and modern apartments are looking for facilities that provide their well-being. The presence of standard garbage shooting increases the class of the building and makes it easier to sell units. This is a smart investment.

final word

Waste management in tall buildings is no joke. The health of the residents and the health of the living environment depends on the correct disposal of waste. The construction and installation of waste shooting with dedicated channelization is a combination of precision engineering, quality materials and professional execution. We at Fadakar Group are proud that we have been responsible for designing and implementing shooting systems in many prominent projects in Tehran and other cities.

Our expert team is ready to be with you from the consultation stage to the final implementation and delivery. We promise you that by choosing dedicated channeling, you will touch a different experience of quality and commitment. Don't worry about the bad smell of garbage, broken elevators and the ugly appearance of garbage bags in the corridors.

For free consultation, project visit and price inquiry for construction and installation of waste shooting with dedicated channelization, contact our contact numbers today. Let us put technology to your convenience. Fadakar channelization, a reliable name in Iran's facilities and air conditioning industry.

Content support expert - code 06 - extension 132

Content support expert - code 06 - extension 132

Post Author

6485Post
View Page

I am a content support expert with code 06 in Behazi. My job is to manage, upload and optimize business content. To contact me, you can call 01391001011 extension 132.

نظرات و تجربیات شما

دیدگاه شما چیست؟

با ثبت امتیاز خود، به ما در تولید محتوای بهتر کمک کنید.