The importance of installing and moving air conditioners in Islamshahr without gas leakage
Technical steps of moving the split without wasting refrigerant
1. Turn on the device in cooling mode
2. Connecting the manifold gauge to the service valve
3. Closing the valve (narrow pipe)
4. Pressure monitoring and closing the return valve (thick pipe)
Tools needed for basic installation and handling
- A set of Allen keys: to open and close the return and return valves.
- Manifold gauge (pressure gauge): to accurately measure the refrigerant gas pressure during the pumping process.
- French wrench and box wrench: to open the brass nuts of copper pipes.
- Vacuum device: to evacuate moisture and air inside Pipes after re-installation.
- Primer tape and pipe insulation: To protect copper pipes against temperature changes and impact.
Key points when reinstalling the air conditioner
Washing and vacuuming pipes
Checking the absence of leakage in piping connections
Why choose the specialized services of Aria Air Conditioning?
Risks of unprincipled movement of air conditioner
- Damage to the compressor: If the gas is not properly collected, the compressor will work without refrigerant and will suffer burns due to the extreme rise in temperature.
- Crushing and double-widening of copper pipes: Copper pipes are very sensitive and bending them improperly will block the refrigerant flow path.
- Air entering the cycle Refrigeration: The entry of air causes an increase in the operating pressure of the system, a decrease in the cooling efficiency and eventually damage to the expansion valves.
- Complete discharge of the refrigerant gas: In addition to damaging the skin and eyes of the supervising technician, the sudden release of the gas greatly increases the costs of recharging the gas.