🔷 Cleaning the environment floor 🔷
Before installing the flooring, the floor of the environment must be completely cleaned with a broom so that no pebbles remain on it.
🔷 Placing flooring packages in the desired environment 🔷
Flooring packages should be placed in the desired environment for 48 hours before installation so that their temperature becomes the same as the environment. Note that the temperature of the environment should be set between 18 and 25 degrees Celsius so that the floor glue sticks completely.

🔷 Collecting the previous flooring or parquet 🔷
Before installing new floors, if old parquet or flooring is installed in the environment, collect them and then proceed to install new PVC flooring.
🔷 Environmental floor infrastructure 🔷
PVC flooring can be installed on smooth surfaces such as cement, tiles, ceramics, etc., but in 95% of cases, before installation, the foundation must be made so that the floor of the environment is completely smooth. Even if the floor of your environment is made of ceramic, we need foundation to cover its seams, and only if the floor of the environment has been smoothed and polished with cement, there is no need for foundation. Flooring is done with cement and wood glue. After the subfloor has dried for 24 hours, clean the area again. Note: If a floor heating system is used in your environment, it is not possible to use PVC flooring due to the heating and cooling of the floor and loosening of the flooring adhesives, and for this environment we recommend laminate parquet. p>

🔻 Flooring installation steps 🔻
To install the flooring, first the surface behind the tiles and the floor must be coated with a special glue. Then the floor tiles should be glued on the floor surface.
Finally, after installation, for more beauty, you can use the cornice around the perimeter, which also helps to cover the seams and restrain the flooring. Click to see the design and code of the selected decorative skirting boards.
After installation, do not touch the floor tiles for 24 hours and avoid pulling heavy objects such as refrigerators, sofas and tables on it until the floor adhesive dries completely.
❗️ Note: To install PVC flooring, an expert installer is needed.