Behzi

study time 1 minute

image

Why is it important to implement a prefabricated wall with 3D panels and shotcrete in Golestan and Semnan?

The technical structure of the three-dimensional panel and its function in the structure

What is shotcrete and how does it affect the strength of the 3D panel?

Economical and operational advantages of Neginplast prefabricated wall

Physical characteristics and insulation of Naginplast prefabricated wall

The steps of implementing a prefabricated wall with 3D panels and shotcrete

1. Planting waiting bars in the framework of the structure

2. Installing and leveling the 3D panel

3. Installation of pipes for building facilities

4. Two-way concrete or shotcrete spraying

The role of Golestan and Semnan regions in choosing new building materials

Investigation of earthquake resistance in structures with 3D panels

Key points when buying and implementing prefabricated panels

  • The density of the polystyrene used in the 3D panel should not be less than the standard to maintain the thermal and sound insulation of the wall.
  • The meshes used in the mesh network must have good spot welding quality so that they do not break during the shotcrete.
  • The shotcrete implementation team must have sufficient skill in adjusting the wind pressure and the distance of the nozzle from the wall so that the concrete is spread evenly and the air bubbles remain behind the metal network. did not stay.

Conclusion and invitation to cooperate for the modernization of buildings

Content support expert - code 02 - extension 223

Content support expert - code 02 - extension 223

Post Author

7759Post
View Page

I am a content support expert with code 02 in Behazi. My job is to manage, upload and optimize business content. To contact me, you can call 01391001011 extension 223.

نظرات و تجربیات شما

دیدگاه شما چیست؟

با ثبت امتیاز خود، به ما در تولید محتوای بهتر کمک کنید.