▪️ Two plots are the best plots for building a residential house, and the reason is that there are many windows in the buildings of these plots, and a lot of light can be directed into the house.
▪️ Obtaining a building permit from the beginning It includes these steps: file filing, visit, map order, architectural map design, toll payment, preparation of draft documents and printing of permit or construction permit, in order to file a file in this field, you must go to the electronic service offices and get the required documents. Complete the form specified by the municipality in a system.
.
▪️ When Pi Kenny and Goodbray finished building a residential building, the next stage of the house construction process is checking it in terms of its strength, which is done by a structural engineer, and if needed, the owner is notified that the need for What type of retrofitting is there? After the excavation and the retrofitting stage and before the implementation of the foundation, concrete is applied, which has other different names such as clean concrete, low cement (light) and thin.
▪️The more the number of floors of a building, the density and diameter of the rebars will also increase in the reinforcement process.
▪️After the concreting operation, when the concretes are formed, They are separated and prepared for the implementation of the skeleton.

▪️ Mainly, for the construction and execution of the house skeleton, metal or concrete skeletons are used, both of which are reliable, but considering that the construction and execution of metal skeletons is more expensive, most employers prefer to use concrete skeletons. .
▪️There are many options for the implementation of the roof, such as beam and block roof, Tom roof, Uboot roof, Kubiax roof and iron beam roof.
▪️Walling is actually the last stage of the initial phase. It is the implementation of the building, which includes the external and internal walls of the building.
▪️After the wall-laying stage, it is time to implement facilities such as gas, water, and electricity piping, which also uses fire hoses if needed. .

▪️Flooring in the construction of a residential building is called covering the floor of the house, which can be made of stone, tile, ceramic or wood. It is divided into external, which usually uses stones such as travertine, marble, or Dehbid, or even brick for the exterior, but sometimes only plaster is used for the interior, and sometimes large-sized ceramics or decorative stones are used. /p>
▪️ In order to optimize the storage space at home, it is better to use unused spaces to install wall closets to cover many of your things. The choice of wall closet depends on the interior space of the building and the number of people living in them.


