Plumbing of the building is one of the important actions in the construction stages of the building, which is of great importance. Not doing the plumbing system of the building correctly may cause problems in the future. Therefore, it should be left to an expert.

ای Technical tips that must be observed for the building's piping time are:
Taking care of the pipes and piping system in front of construction materials:
Considering the fact that when building plumbing, other construction operations are also carried out and it is possible In order to damage pipes and plumbing equipment, it is mandatory to observe the following points:
- The piping route and pipes must be cleared of various construction materials, including sharp pumice. The pipe roll should not be placed directly on the floor of the building under construction. To prevent this, by placing cardboard or cardboard under the pipe, it is protected from possible damage.
- After the execution of each piping route, the pipe, tested and approved by the supervising engineer, the said pipe route is covered with light mortar. It should be covered to protect it from possible damage and not harm it.

Use of tube foam resistant to sunlight:
If tube foam is exposed to sunlight for a long time, it will be damaged, so it is important to take care of it against sunlight. It is necessary.
Choosing the horizontal path of piping on the floor:
If the piping is built-in, horizontal paths should be considered only in the floor of the building and at the end to reach the faucets. They enter the wall.
Using original O-rings:
If original O-rings are not used, after a while there will be leakage problem and it will cost a lot to repair those parts. You can usually buy original O-rings from authorized dealers.
Covering pipes in the cold :
It should be kept in mind that pipes that are in the open and may be exposed to cold must be covered with a suitable layer. Because extreme cold brings freezing of pipes and can also lead to pipes bursting.
Connection between the Newpipe piping system and the metal piping system:
It must be noted that for the connection between the Newpipe spool nut and the opposite thread, it is necessary to The O-ring of the spool should be placed inside the chamfer of 45 degrees in order to observe the technical principles correctly. Due to the fact that metal connections do not have such conditions, we are not allowed to directly connect the Newpipe coil nut and the thread of the metal system connections, and we must pay attention to this issue, and we must definitely use items such as hubs and conversions as intermediaries between the Newpipe coil nut and the thread of metal systems. show This issue must be taken seriously.
Connection between polymer pipe and water heater:
According to the plumbing standard of the building, direct connection of Newpipe pipe to the outlet of the water heater (wall and standing) is not allowed and this should not be done in any way. It does the job. Therefore, it is necessary to connect 45.7 cm (18 inches) standard metal pipe to the outlet of the water heater and connect the New Pipe pipe to the end of the metal pipe so that there is no problem. It is worth mentioning that if new condensing packages are used, there is no need to use a metal pipe because in the initial design of these packages, this amount of pipe is placed in the package itself, and there is no longer a problem for the plumber.
Choosing the correct route from the false ceiling to the sanitary system:
In case of piping in the false ceiling and piping in the ceiling, when entering the Newpipe pipe from the false ceiling into the systems For hygiene, the intersection of two walls should be chosen as a vertical path so that there is no problem. Because there is no possibility to install comfort or decorative items in the corner of the wall, and if the said items are installed in other positions of the wall, there will be no damage to the pipes buried in the corner of the wall, and in this case, no damage will be done to the pipe. br>