What are the different ways to build a pool?
⚡️In general, home pools are made in different ways such as brick, Concrete pouring and prefabricated swimming pools are implemented, each of which requires the presence of specialist personnel and is beyond the scope of non-specialists.

Building a swimming pool with bricks
To build small pools or temporary pools, using bricks is very convenient and cheap. Of course, it goes without saying that brick pools do not have much resistance against external forces, but due to their insulation, they will not have any problems in terms of water not passing to the lower layers for years.

The method of building a swimming pool with bricks is that after excavating and cementing the floor, porcelain bricks are applied and for the stability of the walls at certain intervals according to the depth and length of the wall, They are placed in columns. Then the steps of insulation, implementation of facilities and then tiling or painting are performed.
✳️ Building a pool with concrete
Concrete pools are among the most popular pools. These pools have good stability against external forces due to the use of rebar in them and being made with reformed concrete. Concrete pools are classified as permanent pools due to their high durability. The method of constructing a concrete pool is that after digging the soil, the bottom of the pit is cemented and then reinforcement is done. After the rebars are installed, they are molded and concreting is done, or they use insulating polymer cement that is sprayed instead.
Of course, the implementation of mechanical and electrical facilities is done before the concreting stage. At the end, tiling and decoration of the green space around the pool is done.
✳️ Implementation of prefabricated swimming pool
Prefab pools are among the most popular pools. These pools are made of resin polymers and are custom made in different sizes and shapes. After the pool is built in the factory, the expert group goes to the installation site and installs the prefabricated pool. The steps of installing a prefabricated swimming pool are as follows: excavation and foundation are done first, like the implementation of other swimming pools. After the substructures are done, sandblasting is used for the prefabricated pool, by installing the pool and leveling it with the neighboring land, the surrounding area is filled and beautification is carried out around it. Prefab pools are among the most popular pools. These pools are made of resin polymers and are custom made in different sizes and shapes. After the pool is built in the factory, the expert group goes to the installation site and installs the prefabricated pool. The steps of installing a prefabricated swimming pool are as follows: first, like the implementation of other swimming pools, excavation and foundation are done. After the foundation is done, sandblasting is used for the prefabricated pool, by installing the pool and leveling it with the neighboring land, the pool is filled and beautification is carried out around it.
Running an outdoor pool
✳️ In the following, the stages of implementation and construction of the pool are described in several different ways.
First stage: carving and porcelain block
First, we draw the desired dimensions on the ground according to the designed map and consider about 70 cm around the perimeter of the drawing, and then we start digging and carving. This carving is carved to the desired depth in different parts. It should be considered that the finished floor will create the desired depth after the floor concrete and tiling to the ground level. After carving, we will reinforce the floor with 14 grade rebar and then pour concrete with grade 350. The thickness of the concrete is 20 to 25 cm. How to build a pool with cement blocks is one of the easiest ways to build a pool. This method of building a pool is the most economical way to build a villa pool with a small water volume. In this method, block walls are built on the floor after the foundation and concreting of the floor. So that after leveling the surface of the pool floor and its slope, you can start stacking the blocks.
Pay attention to use a more fluid mortar to fill the blocks so that all the holes in the block are taken. The use of stone without moisture absorption is also suggested for filling the block. Due to the lack of reinforcement in the walls of the pool, it should be noted that all the seams of the block are arranged carefully. After the porcelain block stage, the cementing operation can be done using the pool insulation resin that is mixed with cement mortar. . The use of pool sealing resin, in addition to the extraordinary strength of cement and better adhesion with the block, can also perform the pool sealing operation in one step. The method of sealing the pool with insulating materials is recommended in all stages after the porcelain block. In another method of sealing the pool, after the blocks are installed, cement with a thickness of 5 cm can be applied on the blocks, and then all the cement holes are covered with a new combined sealing material that uses resin and fibers with a 5 mm thick brush. smoothed and polished the surface of the pool, which, in addition to sealing the pool, makes the surface of the pool smooth.
⚡️ Use of wall reinforcement instead of porcelain blocks
To build the wall of the pool after the floor concrete has dried, make the molding around the pool in such a way that the reinforcements that are placed on the floor and bent are placed in the middle of the mold. . Then we perform concreting and vibration inside the molds to have a smooth surface. The time for sealing and tiling is after drying and opening the molds. Please note that during molding and concreting, you must pass the utility pipes for water purification, pumps and electric cables for lighting inside the pool, so that after concreting, you must not drill holes in the wall again.
Second stage: Sealing and tiling
Sealing can be done by concrete sealing materials and concrete glue, and it can also be insulating sheets such as geocomposite, geotextile, etc. The importance of sealing is that if a part of the pool leaks, that part must be resealed. and this issue will involve a higher cost. To avoid this problem, a water test should be taken after sealing, in such a way that we completely water the pool once and measure the water level after 5 days. If the water level has not gone down and the walls of the pool have not been wet from the outside, it is clear that the sealing has been successful.
After sealing, it is time for tiling. Tiling is done based on the desired design and coloring. Before tiling, if we use a skimmer for the water head, we will do the tiling up to the edge of the pool, but if the head design is in the form of a grill, the edges of the grill pool will be worked and it cannot be tiled.
< /p>
The third step: watering the pool and turning on the facilities
Next to the swimming pool, a small motor house should be built to install and run the facilities related to water purification, desired water temperature, chlorine injection, lighting, etc. Usually, the engine room floor level is 70 cm to 1 meter lower than the pool floor level. After tiling and washing the pool, we will water the pool and turn on the water pumps and filtration system. The pool is ready for use.