Compliance with the following points guarantees the safety of the crane.

🔰 Your machine must obtain the technical health certificate from an authorized center, which is issued after checking all parts of the machine for a certain period.
🔰 Pre Before starting to work with the machine, make sure that there is no oil leakage, that the towing wires and the breaker switch and brakes are healthy.
🔰 Before starting work, try the hook and levers.
🔰 Before jacking, inspect the place. and be sure to put timber under the jacks.
🔰 Make sure there is no power grid above your head.
🔰 The minimum safe distance from the electric current is 6 meters.
🔰 Before lifting the load, sound the horn. Notify other people
🔰 Make sure that your rigger knows exactly the signs and rules related to his work and has technical information about his work.
🔰 The driver must know how to work with the load chart.< br> 🔰 If the weight of the load is equal to the final capacity of the crane, it should be moved under the control of the safety unit. Strong winds must stop the work.
🔰 Crane drivers must have a valid certificate and undergo a medical examination. .

ایمنی جرثقیل، تخلیه و حمل با جرثقیل های سبک و سنگین در نوشهر

Crane

When using any type of crane, it is necessary to pay attention to these points and it guarantees maximum safety for the crane operator and members of the lifting team.
🔰 The daily visit of the operator to all the parts of the crane before starting the work and sufficient accuracy of the condition of the parts.
🔰 The maximum permissible capacity of the crane must be engraved on the sides of the machine. All gears and other power transmitting parts must have proper protection and cover. Under no circumstances should the load be kept suspended in the air for a long time. To move heavy loads, First, lift the load up to 150 mm from the ground. If nothing happens, move the load carefully.
🔰 In cases where the operator does not have a full and correct view of the route, a signaler must give the necessary signals. give it to him.
🔰 Before starting work, make sure that the protective brakes are healthy; Protective brakes must hold a load equivalent to 1.5 times the permitted capacity. 🔰 When the mold is in the lowest possible position, at least 2 turns of the cable should remain around the roller. 🔰 Shock stop while lifting the load. Do not enter the crane.