Behzi

How to install sports flooring

How to install sports flooring

flooring

Reading Time 1 Minutes

The installation of sports flooring has 5 key steps, each of which must be done in a correct and principled way, otherwise, in a short period of time, the flooring will have problems, which will gradually separate from the surface of the ground while losing its beauty.

These steps include:

1- Underlaying

The underlaying stage after completely cleaning the surface from dust, materials Composed of wood glue, cement powder that has been diluted in water is poured on the concrete surface to fill the surfaces that have gaps or cracks so that the surface has good adhesion during the installation of the flooring. 2- Gluing At this stage, spread the flooring rolls on the ground and install the special adhesives for PVC flooring using a special squeegee. He stretches it behind the flooring rolls and places it in a place to dry, and then covers the surface of the gym with the same glue. 3- Marking After drying the glue of the hall surface, according to the standard dimensions of the sports field, for example for futsal (40 meters long and 20 meters wide), demarcation lines are marked with colored ropes in relation to the center point of the field until each of the colors of the flooring. be installed exactly in the special place.

4- Flooring installation

The flooring rolls that were glued in the previous steps, after making sure that they are dry, the rolls are opened and placed on the surface of the hall that was previously The glue was eaten and installed. From the second row, the rolls are stuck to the edge of the previous roll with pressure, so that there is a relative pressure on each other, which causes no gaps between the flooring after the reduction of the volume of the polymer due to the volatility of liquids such as solvents. After the installation stage is finished, the roller is moved on the surface of the hall to ensure the adhesion of all the surfaces. 5- Thermal stitching After completion During the installation stage, a small gap is created at the point where the floors are connected to each other, and in order to fix these gaps, the thermal sewing of the flooring rolls is done so that the hall is completely level and when washing the hall, water does not penetrate under the flooring and cause The floor should not be covered. The slits are drawn until the stage of thermal sewing takes place inside the slits so that the surface of the hall does not have a tower stone. At this stage, the robotic device, whose front wheel is called a rail, guides the device. The middle part of the device is equipped with an infrared heating system, which melts the thermal sewing thread of the same color inside the gap between the two floors, and the end part of the device, which makes up the majority of the device's weight. It enters with another part that is made of Teflon coating and has a dimple, and this dimple is placed on the PVC wire and the molten material is poured into the cracks and pressed. Thermal stitching is a beautification step where cosmetic work is done on the flooring in such a way that the extra parts that are outside the gaps are cut by special cutting blades so that the flooring is completely level. br>

Post Author

2372

common:article

View Page

Similar Posts