Services of Architecture Engineering Office
Designing architectural plans for villas, residential, office and commercial apartments, which are different depending on the type of uses and criteria and standards. These maps are prepared and provided to the employer after the approval of the zero-phase maps.
Correcting, optimizing and changing the use of the building map
If the employer intends to change the use, or a change in the building map May these reforms be carried out by the architectural team of Fatane Mohebi. Preparation of AS-BUILT plans for old buildings without plans. Ready to have your own building, this is also the responsibility of the architectural team of the Technical Engineering Office.

Structural Design in Engineering Technical Office
Completing the calculations of metal, concrete and industrial structures. The structure of a building can be metal, concrete or other industrial structures according to the client's request and according to the climate and weather conditions at the time of project implementation.
Maps of phase one and two (detail and enlargement):
After completing the architectural maps of phase one and two, it is time to present the maps of phase one and two of the structure, which are prepared more accurately and with more details of the structure. .
Styling, strengthening and carrying out structural plan corrections:
If your building under construction or your old building needs retrofitting, you can get help from our engineering office.

Project Control Expert
A project control expert must be familiar with the constraints, budget, finances and also the timing so that all activities proceed according to the predetermined plan and otherwise as soon as possible by providing sufficient documentation to the managers. Project report. The project control expert of a technical engineering office prepares the schedule and budget allocation in cooperation with the executive team and other people. In general, the task of this expert in this department is divided into 3 parts:
1. Controlling the cost and income of the activities according to the agreement
2. Controlling the efficiency of human resources and machines
3. Preparation, control and updating the schedule
and finally, to obtain the employer's satisfaction, prepare daily, weekly and monthly periodical reports of the project, reports of created documents, performance reports of sub-contractors, reports of cost, income, time and resources forecasts The need is all done in Fataneh Mohebi's technical engineering office with more than 10 years of experience in various fields of architecture.