Stage One: Map preparation, layout, cabin dimensions and capacity

Today, in building design and mapping, elevator positioning is one of the most important parts of the building map. One of the main tasks of architects is to place the elevator in the best possible place on the building plan. The architect and elevator engineer of the company will draw the best plan for the best location of your building by being on site and checking the conditions and the existing map of the building.

Stage Two: Elevators' floor preparation

One of the steps of installing and operating the elevator is to prepare the height up to the floor level, which is usually stated as at least 180 cm to 190 cm. The height of this pit to the floor level usually depends on the type of elevator and the amount of weight it must bear. The floor space of the pit is usually used to install some parts of the elevator such as buffers, fall governor, impact platform and cabin tray.

Stage Three: Ironing Operation (steel structure) of the elevator well

One of the main steps of installing and restarting the elevator is called iron pulling for installing the elevator rail. This step should be done well and professionally. If the iron pulling is done correctly at this stage, it will stabilize the rails of the elevator cabin, and this will make the elevator not shake or vibrate. It is true that all stages of elevator installation are important for safety; But this step, which is known as the iron drawing of the elevator, is considered the most important safety step for the safety of the elevator. For this reason, the drawing of the elevator is designed by specialists and specialized software.

نصب و اجرای آسانسور در رشت

Step Four: Wallpaper around the well

The three sides of the elevator shaft must be separated from the surrounding environment by means of parts or separating walls. The inner surface of these separators should also be properly coated and smoothed. Partition walls run from the finished floor of the first stop to the engine compartment on the roof. The inner surface of the walls of the elevator well should be covered with suitable materials in such a way that they have the least voids. If plaster is used, these surfaces should be covered with a suitable color. Smooth cement sand coating does not need to be painted. The lighting of the elevator shaft should also be suitable.

Stage Five: Creating a motorcycle

نصب و اجرای آسانسور در رشت

Stage 6: Returns the door of the floors

Seventh Stage: Implementation of Cables and Installation of Three Phase Power Panel

Post Author

2271

common:article

View Page

Similar Posts






  • Stage One: Map preparation, layout, cabin dimensions and capacity

  • Stage Two: Elevators' floor preparation

  • Stage Three: Ironing Operation (steel structure) of the elevator well

  • Step Four: Wallpaper around the well

  • Stage Five: Creating a motorcycle

  • Stage 6: Returns the door of the floors

  • Seventh Stage: Implementation of Cables and Installation of Three Phase Power Panel