The Importance of Back -up sloping in Construction
What is a concrete foam and what is the difference with traditional slope methods?
Why is it important to execute the back -to -back sloping with concrete foam in Isfahan?
The process of implementing the back -to -foam with concrete foam in Isfahan
1. Visit and Consultation with Expert
1. Preparation of Roof Level
1. Calculate the standard slope
1. Combining and producing concrete foam
is combined using special generator foam devices, cement mortar, foam and water and ready -made concrete foam.
1. Run and align the concrete foam
Concrete foam mortar is uniformly poured on the roof, and the surface is engineered by trowel or shaft. Professional performance by a specialist team ensures that no point is left without a slope.
1. Inflowing and drying
Concrete foam becomes rigid after 1 to 2 hours and is ready for final insulation or isogam and other coatings.