Importance and necessity of clean room in pharmaceutical industry
The main stages of implementation of pharmaceutical clean room projects in Tehran
1. Initial consultation and feasibility study
2. Conceptual and detailed design (Basic & Detail Design)
3. Selection of materials and equipment
4. Executive operations and construction
5. Testing and Validation
Special challenges of implementing pharmaceutical clean room projects in Tehran
Tehran air pollution and filtration
Space limitation and reconstruction
The role of HVAC systems in pharmaceutical cleanrooms
- Temperature and humidity control: Some drugs are extremely sensitive to changes in temperature and humidity.
- Fresh air supply: For personnel breathing and to compensate for exhausted air.
- Air filtration: Removal of suspended particles and microbes.
- Creation of pressure difference: To prevent contamination from entering clean spaces.
Classification standards in the implementation of pharmaceutical clean room projects in Tehran
Choosing the right contractor to implement pharmaceutical clean room projects in Tehran
- Experience and work history: Have a successful resume in the pharmaceutical industry.
- Expert technical team: Presence of mechanical, electrical, architectural and quality control engineers.
- Commitment to timing: Delivery of the project on time to prevent the financial loss of the employer.
- After-sales service: Provision of spare parts and periodical services.




