How long does it take to build industrial nest?
The timetable for the construction of industrial niches can vary depending on different factors including project dimensions, design complexity, site conditions and availability of resources. In general, the construction of an industrial nest can take a few months to a year or more.
How do they run the niche ceiling?
The ceiling of the nest is generally running (single sloping or mahogany) and in some cases is a flat or arc -shaped employer, and is often used by galvanized sheets, panel sandwiches and polycarbonate.
How do the wall of the nest run?
The niche wall can be used as cement blocks, earthenware blocks, Crete Wall, 3D Panel, Hoblex Block, Sandwich Panel Wall, Dry Wall, Brick, Camorative Sheet or a combination of these materials.
How much can the height of the nest?
There is no restriction on the height of the nest, and any height can be executed depending on the use of the niche. Generally, the shoulder height of normal niches is between 6 and 8 meters.
How is the contract in the construction of the nest?
The contract can be concluded in wages (merely construction and installation) or with the supply of basic materials including sheets, profiles, paint, electrodes, etc., and construction and installation.