The installation of sports flooring has 5 key steps, each of which must be done in a correct and principled way, otherwise, in a short period of time, the flooring will have problems, which will gradually separate from the surface of the ground while losing its beauty.

These steps include:

Underlaying

The underlaying stage after the surface is completely cleaned of dust, materials composed of wood glue, cement powder that has been diluted in water on the concrete surface It is poured to fill the surfaces that have cracks or cracks so that the surface has good adhesion during the installation of the flooring.

Gluing

At this stage, spread the flooring rolls on the floor surface and install the PVC flooring adhesives using a special squeegee behind the flooring rolls. He stretches it and places it in a place to dry, and then covers the surface of the gym with the same glue.

طریقه نصب کفپوش ورزشی

Marking

After the glue dries, according to the standard dimensions of the sports field, for example, for futsal sports (40 meters long and 20 meters wide), relative to the point The center of the ground is marked by the colored ropes of the boundary lines so that each color of the flooring can be installed exactly in a special place.

Flooring installation

The flooring rolls that were glued in the previous steps, after making sure that they are dry, the rolls are opened and placed on the previously glued hall surface. were installed. From the second row, the rolls are stuck to the edge of the previous roll with pressure, so that there is a relative pressure on each other, which causes no gaps between the flooring after the reduction of the volume of the polymer due to the volatility of liquids such as solvents. After the installation phase is finished, the roller is moved on the surface of the hall to ensure that all surfaces are glued.

Thermal sewing

After finishing the installation stage, a small gap is created at the point where the floorings are connected to each other, and to fix these gaps, the thermal sewing stage of the flooring rolls is done. so that the hall is completely leveled and when washing the hall, water does not penetrate under the floor and does not cause the floor to rise. The gap is grooved until the stage of thermal sewing takes place inside the gaps so that the surface of the hall does not have a tower.